Project Overview
Petro Systems Management has upgraded from using steel pipework in their installations to using KPS conductive plastic piping, enabling simple, fast, long lasting installations, especially when used in conjunction with Fibrelite tank sumps and seal kits as pictured here.
Petro Systems Management upgraded from steel pipework to KPS
Problem
The customer (Petro Systems Management) traditionally installed petrol station sites in Ireland with steel pipe. With an eye on the future, and to help their installation team, Petro Systems Management wanted to move towards using plastic conductive pipe for forthcoming installations, making the switch from the old, heavy, labour intensive, traditional method of working with steel pipes.
Solution
Petro Systems Management already used OPW gauges and were familiar with the OPW team and the quality of OPW products; so when upgrading to plastic pipe (the now industry standard), they chose KPS.
OPW provided classroom and practical training at the offices of Petro Systems Management before the project started to familiarise the installation team with the products and the theory behind electrofusion welding before going on site.
When the first site was under construction, the OPW team were again on hand to offer expert onsite installation training and guidance for all the OPW products used including KPS pipes and Fibrelite sumps.
Petro Systems Management’s first site using KPS piping
Results
KPS piping proved to be the perfect solution for Petro Systems Management. The client has now moved from a traditional steel piping to a modern long-lasting plastic conductive pipe.
When the first site was under construction, the OPW team were on hand to offer onsite installation and guidance